THE PROJECT
Chargers for electric vehicles FAGOR GROUP
LOCATION
Gipuzkoa

Chargers for electric vehicles at Fagor Group facilities.

Promoter:

Fagenezer (company formed by Fagor Group and Krean Group).

Technical team:

LKS KREAN ECS, KREAN Design & Build.

Synopsis:

Royal Decree Law 29/2021, with the aim of continuing with the deployment of the electric vehicle charging infrastructure, incorporates into the legal system new requirements for existing buildings for use other than private residential use with parking for more than 20 spaces.

To align with these requirements, Fagenezer is considering the installation of around 70 electric vehicle charging points in different Fagor Group factories, spread over 19 actions in the group's different cooperatives (Copreci, Fagor Arrasate, Fagor Ederlan, Fagor Industrial, Fagor Automation and Fagor Eléctrónica).

Krean offers a comprehensive service that includes the drafting of the different projects, the application for aid, subsidies and permits for their execution, the execution of the work, their legalisation and commissioning.

The chargers are single-phase (charging in around 8 hours) or three-phase (fast charging, around 3-4 hours), depending on the needs of each user. Their power ranges from 7.5 kW for single-phase chargers with a single socket to 44 kW for three-phase chargers with two sockets.